Contracted Services

Wyandotte and Canada Site Information

Wyandotte joined BASF in 1969 and consists of five production facilities.

Quick Links Contact Information
*Please be patient, as these large videos take a minute or two to load.
Contractor Safety
TES
 
SITE RULES AND STANDARDS
NOTE:  BASF considers all documents you download and/or print from this page non-controlled.
Document Number Document Title
WYN032.001 Line Breaking
WYN032.001a Line Breaking Checklist
WYN032.002 Safety Barricades
WYN032.004 Powered Mobile Equipment
WYN032.004C Aerial Scissor Lift Pre-Use Inspection Guide
WYN032.005 Site Safety Rules
WYN032.006 Contractor EHS Qualification, Orientation, and Oversight  (BASF Contractor EHS Management)
WYN032.007 Personal Protective Equipment (PPE)
WYN032.008 Incident Notification and Reporting
WYN032.009 Preventative Maintenance - Pressure Safety
WYN032.010 Control of Hazardous Energy Sources
WYN032.010a Lock, Tag, Try, and Verify - Master Tag Sheet
WYN032.010b Lock-Box Sign-On Sheet
WYN032.011 Hot Work Standard
WYN032.011a Appendix A - Electrical Equipment Decision Tree
WYN032.017 Grounding and Bonding of Non-Stationary Equipment
WYN032.018 Confined Space Entry
WYN032.019 Use of Vehicles and Transportation of Personnel on BASF Property
WYN032.020 Removal of Material from BASF Property
WYN032.029 Job Safety Analysis (JSA)
WYN032.031 On-Site and Inter-Site Transportation of Chemical Samples
WYN032.037 Standard for Hoses, Hose Fittings, and Testing
WYN032.039 Portable Ladders
WYN032.042 Tobacco Smoking Policy
WYN032.043 Electrical Hot Work
WYN032.043b Clothing and Equipment for Electrical Tasks
WYN032.043c FAQs - Work on Electrical Equipment
WYN032.046 Contaminated Equipment
WYN032.047 Radiation Protection Program
WYN032.048 Operation Control "Out of Service" Equipment Program
WYN032.048a "Out of Service" Tags
WYN032.049 Hazard Communication
WYN032.050 Reporting SAR to Human Heath or the Environment
WYN032.051 Asbestos Management Program
WYN032.054 Safe Work
WYN032.054a Safe Work Permit
WYN032.054b Visitor / Work Authorization Log
WYN032.057 Hot Taps and Stopples
WYN032.057a Hot Tap Fitting Selection Chart
WYN032.057b Hot Tap Permit
WYN032.058 Excavation Procedure
WYN032.059 Reporting Environmental Spills/Releases
WYN032.060 Chemical Waste Management Overview
WYN032.064 Satellite Container Management
WYN032.065 Accumulation Storage Area Requirements
WYN032.069 Universal and Electronic Waste Management
WYN032.075 Management of Change (MoC)
WYN032.081 Rigging, Hosting, and Lifting Procedure
WYN032.081a L/O Crane List
WYN032.081g OSHA 1910.179 Frequent Inspection (w. Optional Preventive Maintenance)
WYN032.081h Critical Lift Permit (Non-Mandatory)
WYN032.081i Hoisting and Rigging Plan
WYN032.082 Elevated Walking/Working Surfaces (Fall Protection)
WYN032.086 Cutting Tool Policy
WYN032.087 Wyandotte Site Medical Plan